Workflow

Gusa – Igpit Section is a 4-Lane concrete pavement highway of about 17.80 Km in length with a 20.00m wide RROW limit. It serves as a by-pass road starting from Brgy. Gusa of the City’s 2nd LD all the way to Brgy. Igpit, Opol in Misamis Oriental. Travel time will be reduced from the 1 hour to 20 mins. due to smooth flow of traffic and reduced travel cost by 30%.